It seems, according to the article, that the local energy operator is a bigger problem than just growing demand from AI - they don’t seem to manage the energy transformation competently, and the issues began pre-chatbots.
“In 2022, PJM stopped processing new applications for power plant connections after it was overloaded with more than 2,000 requests from renewable power projects, each of which required engineering studies before they could connect to the grid”